Cost Structure 2012: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Our enterprise is both Cost-Driven and Value-Driven. For the entrepreneur or maker, our materials costs are typically 1/5-1/10 the cost of turnkey, industrial counterparts. This...") |
m (Marcin moved page Cost Structure to Cost Structure 2012 without leaving a redirect) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
See [[10_Month_Development_Roadmap]] for the cost structure of the Budget. The cost structure after this point is guessed at [[Business_Plan]] under the Body section. | |||
Latest revision as of 14:54, 24 June 2020
See 10_Month_Development_Roadmap for the cost structure of the Budget. The cost structure after this point is guessed at Business_Plan under the Body section.