Line 5: | Line 5: | ||
=Product Strategy= | =Product Strategy= | ||
'''Build a house to change the world''' | '''Build a house to change the world''' | ||
#$10k per seat to participate in XE Event. ($30k per house for after the event) | #$10k per seat to participate in XE Event. But, rigorous skill-set requirements exist. ($30k per house for after the event). '''Preorders ONLY FOR PARTICIPANTS?''' | ||
##Product proper: $50k package total, BYOL. $1k to non-refundable at-risk investment to participate. Total $10k. We need to convince people that it's possible, based on existing documentation and experience. Produce worst-case scenario. '''Basic Ergonomics per 250 SF''' - 16 wall, 16 roof and floor modules. 32 modules. 32 weekends, of 2 hours with 1 person. Includes pile driver attachment for Bobcat, or can be done manually with 2 people. Thus, 6 hour weekends for 3 panels per weekend, for 750 sf, plus a patio ready for next addition. 750-1000 is the sweet spot without a heroic effort. | ##Product proper: $50k package total, BYOL. $1k to non-refundable at-risk investment to participate. Total $10k. We need to convince people that it's possible, based on existing documentation and experience. Produce worst-case scenario. '''Basic Ergonomics per 250 SF''' - 16 wall, 16 roof and floor modules. 32 modules. 32 weekends, of 2 hours with 1 person. Includes pile driver attachment for Bobcat, or can be done manually with 2 people. Thus, 6 hour weekends for 3 panels per weekend, for 750 sf, plus a patio ready for next addition. 750-1000 is the sweet spot without a heroic effort. | ||
##2000 houses produced. 1000 in one year (first batch of 100 entrepreneurs, with 10 houses each guaranteed). New OSE Chapters - 100 entrepreneurs, 10 houses each - by Year 2. '''Note''': this does not leave room for outside house builds. | ##2000 houses produced. 1000 in one year (first batch of 100 entrepreneurs, with 10 houses each guaranteed). New OSE Chapters - 100 entrepreneurs, 10 houses each - by Year 2. '''Note''': this does not leave room for outside house builds. |
Revision as of 15:58, 23 July 2020
Previous Design Concept
- People pay. Q: How do you measure buy-in PRIOR to the event?. This is a second part of having people show up.
- We are testing why aren't people showing up. (as opposed to 'how do we get people to show up. We have a strong and almost 100% conviction that Enterprise (ability to obtain a valuable product to fulfill self-interest, whether a usufruct product or an enterprise for making a living)
Product Strategy
Build a house to change the world
- $10k per seat to participate in XE Event. But, rigorous skill-set requirements exist. ($30k per house for after the event). Preorders ONLY FOR PARTICIPANTS?
- Product proper: $50k package total, BYOL. $1k to non-refundable at-risk investment to participate. Total $10k. We need to convince people that it's possible, based on existing documentation and experience. Produce worst-case scenario. Basic Ergonomics per 250 SF - 16 wall, 16 roof and floor modules. 32 modules. 32 weekends, of 2 hours with 1 person. Includes pile driver attachment for Bobcat, or can be done manually with 2 people. Thus, 6 hour weekends for 3 panels per weekend, for 750 sf, plus a patio ready for next addition. 750-1000 is the sweet spot without a heroic effort.
- 2000 houses produced. 1000 in one year (first batch of 100 entrepreneurs, with 10 houses each guaranteed). New OSE Chapters - 100 entrepreneurs, 10 houses each - by Year 2. Note: this does not leave room for outside house builds.
- $20M revenue funds 20 OSE facilities USA wide, for continued R&D.
- 3 Tracks: Participants, Entrepreneurs, OSE Chapters. Participants - SME stakeholders in house.
- House build in Summer of Extreme Design Build 2021 - with 100 onsite participants (enterprise trainees) with OSE infrastructure upgrades (RV park, outdoor kitchen/bath, camp) - to handle 200 participants.
- Concurrent Collaborative Design Challenge deployed at time of the event - large printer. But this is an extra, not an essential.
- Concurrent challenge to do the High T printer - Crowd Supply.
- Need $250-500k for seed money to organize event.
- $100-200 for the Book.
- Proof-of-concept 256 sf prototype prior to campaign! Get a few people, video it.
- Do the HeroX, Crowd Supply, and Kickstarter at the same time. Free copy of e-book to all people who made OBI kickstarter possible.
- HeroX does the large printer. We do another XE event for the printer build - not part of the HeroX. HeroX is just a reward, but also primarily for publicity sake.
- Crowd Supply - real development - to generate initial interest in XE, as this will be the foundation for the Large Printer for house panels.
- Kickstarter - essentially distribution and funding for the Open Building Institute Take 2, where we also say that we are discovering a way to get beyond the Heroic Effort by leveraging the crowds.
$10k Service Fee House Product
- Cost of $50k for a 1000 sf house that you can build with a friend in one week, BYOL.
$30k Service Fee House Product
- Cost of $70k for a 1000 sf house that you can build with a friend in one week, BYOL.
Full Service Event
- Data: nationwide materials and contractors supply - markets this to all contractors.
- $100k for a house you build in one weekend. Foundation included. $25k in materials.
- Panel builds economics - 24