Project Creep: Difference between revisions
Jump to navigation
Jump to search
(Moved some stuff around) |
(Added a Category to the Page) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
=External Links= | =External Links= | ||
*[https://en.wikipedia.org/wiki/Scope_creep The Wikipedia Page on Project Creep] | *[https://en.wikipedia.org/wiki/Scope_creep The Wikipedia Page on Project Creep] | ||
*[https://en.wikipedia.org/wiki/Instruction_creep The Wikipedia Page on Instruction Creep] (similar concept but with instructions and/or directions, may be of use as a page later, kind of covered enough by [[KISS (Acronym) ]] for now? ) | |||
[[Category: Guiding philosophies]] [[Category: Managment]] | [[Category: Abbreviations, Jargon, and Terminology]] [[Category: Guiding philosophies]] [[Category: Managment]] [[Category: To-Do's]] |
Latest revision as of 04:51, 21 January 2021
Basics
- Also known as "Mission Creep" or "Scope Creep"
- The gradual shift in goals of a project, or addition of projects
- Usually used in regards to mismanagment wherein due to projects shifitng most take longer to finish than if they were done "one by one"
- Does not mean there can be a wide focus/many simultaneous projects, or shifts due to changing circumstances, just that focus on preventing this issue is essential
Internal Links
External Links
- The Wikipedia Page on Project Creep
- The Wikipedia Page on Instruction Creep (similar concept but with instructions and/or directions, may be of use as a page later, kind of covered enough by KISS (Acronym) for now? )