*No insulation covers any wiring or plumbing work.
*No insulation covers any wiring or plumbing work.
*Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing.

Revision as of 15:46, 1 June 2021

  • The rough inspection should be performed before the insulation is installed. This is not stated as a requirement, but a suggestion here. [1]
  • Rough-in inspection can also occur after insulation is in, but it may be more difficult to perform inspection. [2]

OSE Case

  • No insulation covers any wiring or plumbing work.
  • Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing.