Door and Window Detail: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:


<html><iframe width="560" height="315" src="https://www.youtube.com/embed/nY964NYMcv4" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html>
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/nY964NYMcv4" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html>
*Go 6" up from sill pan [https://www.jlconline.com/how-to/exteriors/proper-width-of-window-flashing-tape_o]


=Rough Window and Door Opening=
=Rough Window and Door Opening=

Revision as of 22:16, 4 June 2021

Flashing Tape

  • Corners have 12" long piece, folded around corner. Or use flashing corners
  • this example shows flashing tape over rough opening overlapping only about 1.5" of the front face

  • Go 6" up from sill pan [1]


Rough Window and Door Opening

edit