'''Rough-in inspections include plumbing, electrical, and framing:''' | |||
=Electrical= | |||
*includes wiring and breakers | |||
*Includes ground conductor | |||
*Includes all enclosures - breaker boxes, outlet boxes | |||
*''Switches, receptacles and fixtures should not be installed at the rough-in.'' | |||
=Framing= | =Framing= | ||
*Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place. | *Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place. |
Revision as of 04:34, 10 January 2022
Document for Alaska - [1]
Site Plan
- this is the first inspection
Foundation
Rough-in inspections include plumbing, electrical, and framing:
Electrical
- includes wiring and breakers
- Includes ground conductor
- Includes all enclosures - breaker boxes, outlet boxes
- Switches, receptacles and fixtures should not be installed at the rough-in.
Framing
- Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place.