=Foundation= | =Foundation= | ||
*Slab inspection happens before pouring | |||
*Plumbing under-slab may be inspected prior to covering | |||
'''Rough-in inspections include plumbing, electrical, and framing:''' | '''Rough-in inspections include plumbing, electrical, and framing:''' |
Revision as of 04:45, 10 January 2022
References
Site Plan
- this is the first inspection
Foundation
- Slab inspection happens before pouring
- Plumbing under-slab may be inspected prior to covering
Rough-in inspections include plumbing, electrical, and framing:
Electrical
- includes wiring and breakers
- Includes ground conductor
- Includes all enclosures - breaker boxes, outlet boxes
- Switches, receptacles and fixtures should not be installed at the rough-in.
Plumbing and Mechanical
- Prior to any enclosure, plumbing is inspected
- Includes water, drain, waste, and vents
- Includes HVAC vents; range, dryer and bathroom vents; water heater and venting; others. If water heater is not fuel-fired,
Framing
- Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place.