*Document for Alaska - [https://www.homeinspectalaska.com/construction-phase-inspections/#:~:text=The%20framing%20inspection%20should%20be,installed%20and%20framing%20is%20complete.&text=All%20rough%20wiring%20for%20the,inspected%20at%20the%20same%20time.] | *Document for Alaska - [https://www.homeinspectalaska.com/construction-phase-inspections/#:~:text=The%20framing%20inspection%20should%20be,installed%20and%20framing%20is%20complete.&text=All%20rough%20wiring%20for%20the,inspected%20at%20the%20same%20time.] | ||
*Inspection Descriptions - [http://www.sjcfl.us/buildingservices/media/InspectionDescriptions.pdf] | *Inspection Descriptions Florida - [http://www.sjcfl.us/buildingservices/media/InspectionDescriptions.pdf] | ||
*Guidelines Georgia - [https://cms2files.revize.com/bartowga/Typical%20Order%20of%20Inspections_06-17-16.pdf] | |||
=Site Plan= | =Site Plan= | ||
*this is the first inspection | *this is the first inspection |
Revision as of 04:48, 10 January 2022
References
Site Plan
- this is the first inspection
Foundation
- Slab inspection happens before pouring
- Plumbing under-slab may be inspected prior to covering
Rough-in inspections include plumbing, electrical, and framing:
Electrical
- includes wiring and breakers
- Includes ground conductor
- Includes all enclosures - breaker boxes, outlet boxes
- Switches, receptacles and fixtures should not be installed at the rough-in.
Plumbing and Mechanical
- Prior to any enclosure, plumbing is inspected
- Includes water, drain, waste, and vents
- Includes HVAC vents; range, dryer and bathroom vents; water heater and venting; others. If water heater is not fuel-fired,
Framing
- Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place.