Rough Plumbing Inspection Checklist: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 7: Line 7:
*Supply water line fill is inspected prior to covering
*Supply water line fill is inspected prior to covering
*Approved grounding system for water supply line?
*Approved grounding system for water supply line?
*Tracer wire for water supply from meter to slab
*Tracer wire for water supply from meter to foundation

Revision as of 01:19, 10 March 2022

https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf

Notes

  • Ford fitting for water supply line if supply line connection is inside the house.
  • Water pressure test required
  • Vacuum breakers on hose outlets
  • Supply water line fill is inspected prior to covering
  • Approved grounding system for water supply line?
  • Tracer wire for water supply from meter to foundation