Rough Plumbing Inspection Checklist: Difference between revisions
Jump to navigation
Jump to search
(→Notes) |
(→Notes) |
||
Line 7: | Line 7: | ||
*Supply water line fill is inspected prior to covering | *Supply water line fill is inspected prior to covering | ||
*Approved grounding system for water supply line? | *Approved grounding system for water supply line? | ||
*Tracer wire for water supply from meter to | *Tracer wire for water supply from meter to foundation |
Revision as of 01:19, 10 March 2022
Notes
- Ford fitting for water supply line if supply line connection is inside the house.
- Water pressure test required
- Vacuum breakers on hose outlets
- Supply water line fill is inspected prior to covering
- Approved grounding system for water supply line?
- Tracer wire for water supply from meter to foundation