<iframe width="560" height="315" src="https://www.youtube.com/embed/gI58G6Y2OQA" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html> | <iframe width="560" height="315" src="https://www.youtube.com/embed/gI58G6Y2OQA" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html> | ||
Notes: | |||
*5 lb pressure on a 16 lb gauge | |||
=Links= | =Links= | ||
*[[Plumbing Inspection]] | *[[Plumbing Inspection]] |
Revision as of 06:58, 2 April 2022
Detailed Checklist
Notes
- Each trap protected by vent
- See cleanout requirements.
- Ford Fitting for water supply line if supply line connection is inside the house.
- Water pressure test required
- Vacuum breakers on hose outlets
- Supply water line fill is inspected prior to covering
- Approved grounding system for water supply line?
- Tracer wire for water supply from meter to foundation
Sequencing
- Water Heater - Since it is a fixture [1] - a water heater is installed in the finish phase [2]
- Water heater is often installed at rough plumbing phase [3]
At Foundation Phase
- There may be an inspection during the foundatio phase.
Notes:
- 5 lb pressure on a 16 lb gauge