Inspection Schedule: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (→Links) |  (→Links) | ||
| Line 8: | Line 8: | ||
| =Links= | =Links= | ||
| *[[Plumbing Inspection]] | |||
| *[[KC Inspections]] | *[[KC Inspections]] | ||
| *[[Rough-In Plumbing Inspection]] | *[[Rough-In Plumbing Inspection]] | ||
| *[[Rough-In Electrical Inspection]] | *[[Rough-In Electrical Inspection]] | ||
| *{{check}}'''[[Under Construction Phase Inspections]]''' | *{{check}}'''[[Under Construction Phase Inspections]]''' | ||
Revision as of 22:16, 3 May 2022
- The rough inspection should be performed before the insulation is installed. This is not stated as a requirement, but a suggestion here. [1]
- Rough-in inspection can also occur after insulation is in, but it may be more difficult to perform inspection. [2]
OSE Case
- No insulation covers any wiring or plumbing work.
- Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing.
- Smoke detectors are required on the electrical side - [3]
