OSE Infrastructure Improvements 2022: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 3: | Line 3: | ||
**24 homes connect readily, via 4". 4" is fine for 180 [[DFU]] | **24 homes connect readily, via 4". 4" is fine for 180 [[DFU]] | ||
**If we have 240 living units - then 18 DFU per house may be ok based on 4" pipe from home cluster, and 8" pipe to plant | **If we have 240 living units - then 18 DFU per house may be ok based on 4" pipe from home cluster, and 8" pipe to plant | ||
**septic fertigation size - see [[Drip Irrigation]] | |||
*Mobile structural microhouses | *Mobile structural microhouses | ||
*Regular microhouses | *Regular microhouses |
Latest revision as of 16:24, 30 May 2022
Infrastructure
- Long sewer line, 8" - [1]
- 24 homes connect readily, via 4". 4" is fine for 180 DFU
- If we have 240 living units - then 18 DFU per house may be ok based on 4" pipe from home cluster, and 8" pipe to plant
- septic fertigation size - see Drip Irrigation
- Mobile structural microhouses
- Regular microhouses
- IFWMS system
Ongoing
- Pond making and terraforming according to updated version of Site Plan
- Soil-food web biomass/manuring of trenches
- Wood chipping
- Haying
- Mowing
- Multiplying comfrey
- Mulberry propagation
- Moving Cedar trees
- Moving manure from nearby region
- Hazelnut cultivation