Gary Cook: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
*$65 for union plumber | *$65 for union plumber | ||
*Pumping station - cost - | *Pumping station - cost - 8' deep. Pump rails on side of hole. Forced main. One of the pumps - pumps cost - couple grand. 8' manhole 3' wide - $5-6 | ||
*Precast manholes - Black and Gunnite in St. Joe; Ring and concrete - they have a crane that could set the manhole right | |||
*$25-30 per foot for boring - about 50-70 side to side - 4" sanitary line $4.65 day; M-Con construction - $2100 - excavation costs on both sides. 1 hour for each side - $300 for excavator | *$25-30 per foot for boring - about 50-70 side to side - 4" sanitary line $4.65 day; M-Con construction - $2100 - excavation costs on both sides. 1 hour for each side - $300 for excavator | ||
*Can you tell me | *Can you tell me | ||
*Tyler Swings | *Tyler Swings | ||
*Excavator cost per hour - $115/hr | *Excavator cost per hour - $115/hr | ||
* | *They can petition city for septic on city lot. | ||
*Septic 12-15k, worst case $25k for drip system | *Septic 12-15k, worst case $25k for drip system | ||
*Sewer at about $25k | |||
*Room |
Revision as of 20:00, 3 November 2022
- $65 for union plumber
- Pumping station - cost - 8' deep. Pump rails on side of hole. Forced main. One of the pumps - pumps cost - couple grand. 8' manhole 3' wide - $5-6
- Precast manholes - Black and Gunnite in St. Joe; Ring and concrete - they have a crane that could set the manhole right
- $25-30 per foot for boring - about 50-70 side to side - 4" sanitary line $4.65 day; M-Con construction - $2100 - excavation costs on both sides. 1 hour for each side - $300 for excavator
- Can you tell me
- Tyler Swings
- Excavator cost per hour - $115/hr
- They can petition city for septic on city lot.
- Septic 12-15k, worst case $25k for drip system
- Sewer at about $25k
- Room