Seed Eco-Home 4 Industry Standards: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
**Crane and shipping offsets cost savings of factory build. Price same as market at the end. | **Crane and shipping offsets cost savings of factory build. Price same as market at the end. | ||
**Same design philosophy - better materials and appliances (superefficient) to make operating costs lower. | **Same design philosophy - better materials and appliances (superefficient) to make operating costs lower. | ||
**Did 10 houses so far. | |||
*Boxabl | *Boxabl | ||
*Etc | *Etc |
Revision as of 17:29, 22 February 2023
- Module - [https://www.pbs.org/video/module-pittsburgh-pa-fizv97/.
- $1M, 4 houses, mixed low income + market rate. 2 banks. $100k subsidy from local paperwork. First time minority buyer. And corporate?
- Same build cost as traditional construction
- Uses existing factories
- Got 50 foundations to fund their own factory. for 200 homes per year, 95 people. Opening 2024.
- Crane and shipping offsets cost savings of factory build. Price same as market at the end.
- Same design philosophy - better materials and appliances (superefficient) to make operating costs lower.
- Did 10 houses so far.
- Boxabl
- Etc