Missouri Building Codes: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*St. Joseph follows 2017 NEC [https://www.iaei.org/page/missouri-electrical-ceus] *")
 
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
*St. Joseph follows 2017 NEC [https://www.iaei.org/page/missouri-electrical-ceus]
*St. Joseph follows 2017 NEC [https://www.iaei.org/page/missouri-electrical-ceus]
**Attached garage requires dedicated circuit for outlets 210.11(c)4 [https://www.electricallicenserenewal.com/Electrical-Continuing-Education-Courses/NEC-Content.php?sectionID=814.1]
*
*

Latest revision as of 07:15, 24 July 2023

  • St. Joseph follows 2017 NEC [1]
    • Attached garage requires dedicated circuit for outlets 210.11(c)4 [2]