5 Minute Part Replacement: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
Line 1: Line 1:
OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry.
OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. We are aiming for a maximum.iteration of 3 five-minute deconstruction layers to extract and replace any part

Latest revision as of 19:11, 29 June 2024

OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. We are aiming for a maximum.iteration of 3 five-minute deconstruction layers to extract and replace any part