5 Minute Part Replacement: Difference between revisions
Jump to navigation
Jump to search
m (Marcin moved page 5 Minute Replacement to 5 Minute Part Replacement) |
No edit summary |
||
Line 1: | Line 1: | ||
OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. | OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. We are aiming for a maximum.iteration of 3 five-minute deconstruction layers to extract and replace any part |
Latest revision as of 19:11, 29 June 2024
OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. We are aiming for a maximum.iteration of 3 five-minute deconstruction layers to extract and replace any part