Drywall Finishing: Difference between revisions
Jump to navigation
Jump to search
(→Time) |
No edit summary |
||
Line 1: | Line 1: | ||
{{Hint|Finishing takes as long as handing, but costs indicate that it is about 2x times the labor of hanging. Hanging is just 1/3 the job}} | |||
*How to hang drywall [https://www.youtube.com/watch?v=laF34taUp1A] | *How to hang drywall [https://www.youtube.com/watch?v=laF34taUp1A] | ||
Revision as of 06:13, 15 July 2024
Hint: Finishing takes as long as handing, but costs indicate that it is about 2x times the labor of hanging. Hanging is just 1/3 the job
- How to hang drywall [1]
- Tape and mud video [2]. Corner strip. 3 coats of mud over every edge or screw. Taping. Corners. Bulk sanding. Edge sanding. Ready to paint. Wow, lots of work.
- Power roller video - [5]
Time
- Forbes Home details [6]
- One wall in a day -[7]. 5 hours for a wall with many penetrations.
- 7 poeple, 4 days, 1000 sf - 224 hours [8]
- 144 hrs 1000 sf [9]
- Amateur takes 2400 hours for 3000 sf house [10]
- 250-300 sheets with 2 man crew in 8-9 days [11], about half to hang and half to finish.
- 16 sheets per person per day. 1/2 hr per sheet total.
- 8800 sf*$1.5 = $14k or so in labor.
- SEH - about 180 BB sheets?