Seed Eco-Home 4 Build Index: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
[https://docs.google.com/presentation/d/1wPkuo8pZ7F8uV9VMRqLuc3Tug_DgEFrHZA5QTgxY5xw/edit?slide=id.g33e365678ac_0_5#slide=id.g33e365678ac_0_5 edit]
[https://docs.google.com/presentation/d/1wPkuo8pZ7F8uV9VMRqLuc3Tug_DgEFrHZA5QTgxY5xw/edit?slide=id.g33e365678ac_0_5#slide=id.g33e365678ac_0_5 edit]


=vBOMs=
=Final Cost Spreadsheet=
 
Costs include labor, carrying costs, land, permits, utilities, machines, materials, gas to travel to work site. There are other costs that aren't embodied in the final product, such as was and mistakes.
 
<html> <iframe src="https://docs.google.com/spreadsheets/d/e/2PACX-1vQH5-PKg22Uvkei6HJj7x-72jEoE0sNMnQBFuVnuVDsjMzVNsbK1nr2h73hmaxMnlXpdJas-zPiU9X2/pubhtml?widget=true&amp;headers=false" height=500 width=1000></iframe> </html>


=Final Cost Spreadsheet=
[https://docs.google.com/spreadsheets/d/1gdLj8JvYkAdIkUwGFVTFmwaP_HZ9aqMLucWQEEtCTTk/edit?gid=946274716#gid=946274716 edit]
<html> ________________________________ </html>


[_______________________________________ edit]
=vBOMs=

Latest revision as of 04:10, 31 March 2025

Build Index - vBOMs - Master Cost Spreadsheet

edit

Final Cost Spreadsheet

Costs include labor, carrying costs, land, permits, utilities, machines, materials, gas to travel to work site. There are other costs that aren't embodied in the final product, such as was and mistakes.

edit

vBOMs