CEB Press Documentation: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 5: Line 5:
=Fabrication Procedure=
=Fabrication Procedure=


#Prepare all required tools (complete documentation of tools used)
#Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this)
#Purchase stock metal and other components (several full, well-organized pages are needed here)
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
##Stock steel
##Stock steel (pictures from first build are desirable here)
##Hydrauilics
##Hydrauilics (complete lists already documented on wiki, need to be organized)
##Controller
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
##
 




[[Category:CEB Press Documentation]]
[[Category:CEB Press Documentation]]

Revision as of 19:54, 6 June 2011

Introduction

This marks the first epic effort at organizing CEB Documentation towards a complete fabrication procedure with all supporting materials. Several attempts have been tried over the last 3 years, none of which were ripe for success as much as this one.

Fabrication Procedure

  1. Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this)
  2. Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
    1. Stock steel (pictures from first build are desirable here)
    2. Hydrauilics (complete lists already documented on wiki, need to be organized)
    3. Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)