*1:3:3 is 3000 PSI [https://www.rtsconstructioncompany.com/blog/concrete-mixing-ratios-a-guide]
*1:3:3 is 3000 PSI.[https://www.rtsconstructioncompany.com/blog/concrete-mixing-ratios-a-guide]
*1/6 concrete is water
*Concrete mix is 10-15% cement
*Concrete mix is 10-15% cement
*Portland cement costs $13/bag 93 lb [Portland Cement Type IL - 92.6 - 94 lbs at Menards® [  
*Portland cement costs $13/bag 93 lb [Portland Cement Type IL - 92.6 - 94 lbs at Menards® [  


[https://www.menards.com/main/building-materials/concrete-cement-masonry/bagged-concrete-cement-mortar/portland-cement-type-il-92-6-94-lbs/1891149/p-1642874260925542-c-5648.htm]
[https://www.menards.com/main/building-materials/concrete-cement-masonry/bagged-concrete-cement-mortar/portland-cement-type-il-92-6-94-lbs/1891149/p-1642874260925542-c-5648.htm]

Revision as of 22:04, 11 May 2025

Concrete Mix Rates

  • 4 minutes per bag - Mudmixer. 3.5 hr for 50 bags. [1]

About

  • 1:3:3 is 3000 PSI.[2]
  • 1/6 concrete is water
  • Concrete mix is 10-15% cement
  • Portland cement costs $13/bag 93 lb [Portland Cement Type IL - 92.6 - 94 lbs at Menards® [

[3]