RLF Build Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with " =Work Doc= {{subst:embed}}")
 
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
=Work Doc=
=Work Doc=


<html> ________________________________ </html>
<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vTF-bpNKuA8teKOAeL6hQBt0JgquoUlJnu9oq0i6O97_c6gY23796x6kbFz33GZqDxwDMP9JjB3Tcx9/pubembed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html>


[_______________________________________ edit]
[https://docs.google.com/presentation/d/1UWzIanNFRqPP5td7yyYe-ZYHQwtEC-d2u8VBY6wPIfs/edit?slide=id.g35dbe6dd3ca_2_0#slide=id.g35dbe6dd3ca_2_0 edit]
 
=Mon Aug 4, 2025=
*Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [https://photos.app.goo.gl/P1kSZRivyDomwHFGA]. Album - [https://photos.app.goo.gl/KE69C2NtMXvnd3Y76]
 
=Sat Aug 2, 2025=
*Major lessons - no mods to modules.
*Numbered and prepared ahead of time.
*Major block once the T caps entered - blocking was impossible so it meant drilling holes to attach blocking. And slitting the OSB, weakening shear capacity.

Latest revision as of 21:37, 4 August 2025

Work Doc

edit

Mon Aug 4, 2025

  • Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [1]. Album - [2]

Sat Aug 2, 2025

  • Major lessons - no mods to modules.
  • Numbered and prepared ahead of time.
  • Major block once the T caps entered - blocking was impossible so it meant drilling holes to attach blocking. And slitting the OSB, weakening shear capacity.