May Production Plan: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 11: Line 11:


*Identify Power Beyond Fittings for main valves -  
*Identify Power Beyond Fittings for main valves -  


=Power Cube Tasks=
=Power Cube Tasks=
Line 24: Line 26:
*Weld mount eye on bottom Power Cube Mount
*Weld mount eye on bottom Power Cube Mount
*Mag drill holes in frame -
*Mag drill holes in frame -
*Mount Power Cube on Tractor


'''Test Power Cube'''


'''Test Power Cube'''
*Move PC with tractor I
*Move PC with tractor I
*Mount Power Cube on Tractor
*Mount Power Cube on Tractor
Line 55: Line 58:


*Mount suction strainer in tank
*Mount suction strainer in tank
*Mount fittings up to 3/4" hose barb
*Mount suction strainer fittings up to 3/4" hose barb  
*Cut hose to size
*Cut hose to size
*Mount breather cap
*Assemble return line filter assembly
'''Prepare Electrical System Components'''
*[4] Cut lugs
*[4] Drill lugs
*Prepare battery to solenoid wire
*Prepare solenoid to starter wire
*Prepare
*Drill frame and attach solenoid to frame
*Prepare wires:  kill switch wire, charging wire, wire to switch, wire to solenoid
*


'''Weld Mufflers – do 8 more'''
'''Weld Mufflers – do 8 more'''
Line 69: Line 85:
*Torch muffler flange, use #1 torch head
*Torch muffler flange, use #1 torch head
*Procure gasket material for mufflers
*Procure gasket material for mufflers
*M
 
[[May Production Run Generator Tasks]]


“Prepare Second Generator”
“Prepare Second Generator”

Revision as of 14:34, 16 June 2011

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required
  • Allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday


Shopping List

  • Identify Power Beyond Fittings for main valves -


Power Cube Tasks

Shake Down Motor Size

  • Start with Power Cube mounting. Measure Power Cube and location of mount
  • [2] Cut Mount – 1/4x4 by appropriate measurement
  • [2] Drill Mounts – 2 holes on ends each
  • Transfer punch mount hole locations for top and bottom mount
  • Mark mount hole locations on other side of beams
  • Weld Mount eye on bottom of Power Cube
  • Weld mount eye on bottom Power Cube Mount
  • Mag drill holes in frame -
  • Mount Power Cube on Tractor

Test Power Cube

  • Move PC with tractor I
  • Mount Power Cube on Tractor
  • Connect Hoses

Build Hydraulic tanks

  • Work on 3 at a time
  • Grind tanks down to clean
  • Clean edges and bungs
  • Ream any necessary holes
  • Lay out 3 sets on welding table
  • Close off bungs with fittings
  • Tack everything
  • Weld
  • Assemble

Prepare Engine and Pump Mounting

  • Assess fittings for hydraulic pump
  • Put fittings on hydraulic pump
  • Cut plate for Engine Mount
  • Cut plate for hydraulic pump
  • [1] Cut angle for Power Cube Mount


Prepare Hydraulic system components

  • Mount suction strainer in tank
  • Mount suction strainer fittings up to 3/4" hose barb
  • Cut hose to size
  • Mount breather cap
  • Assemble return line filter assembly

Prepare Electrical System Components

  • [4] Cut lugs
  • [4] Drill lugs
  • Prepare battery to solenoid wire
  • Prepare solenoid to starter wire
  • Prepare
  • Drill frame and attach solenoid to frame
  • Prepare wires: kill switch wire, charging wire, wire to switch, wire to solenoid

Weld Mufflers – do 8 more

  • Secure 8 close nips, 1”
  • Secure 8 elbows, 1”
  • Cut 2 rings – flange and end piece of large tube
  • Grind and ream rings
  • Prepare 1 washer – 1/2” - for closing inner tube
  • Prepare 1 closure of washer
  • Mark pattern for muffler flange
  • Torch muffler flange, use #1 torch head
  • Procure gasket material for mufflers

May Production Run Generator Tasks

“Prepare Second Generator”

  • Put fittings on motor
  • Pack up old motor