Build Hydraulic Tanks: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
*Secure 3 bungs - 3/4" for filler/breather, 1" for return line filter, and 2" for suction strainer (extender plus bung proper)
*Secure 3 bungs - 3/4" for filler/breather, 1" for return line filter, and 2" for suction strainer (extender plus bung proper)
*Torch out 3 bung holes as in last step
*Torch out 3 bung holes as in last step
*Grind tank edges and bung edges clean wherever bead will be welded.
*Grind tank edges and bung edges clean wherever bead will be welded. This is a critical step that helps eliminate pinholes after welding.
*Clean edges and bungs
*Clean edges and bungs
*Ream bungs as necessary for cleaning and fit
*Ream bungs as necessary for cleaning and fit
Line 12: Line 12:
*Assemble tank
*Assemble tank
*Test hydraulic tank with air pressure and soap solution  
*Test hydraulic tank with air pressure and soap solution  
**Connect air pressure hose, plug 3/4" and 1" bungs withfill air into suction strainer with reducers down to air barb starting from filler
**Connect air pressure hose, plug 3/4" and 1" bungs for air tightness
*Grind and weld any pinholes
**fill air into suction strainer opening - after plugging with reducers down to air barb star. Use suction strainer as one of the reducers.
*Grind and weld any pinholes, retest, iterate if needed
*
*


[[Category:Fabrication Procedures]]
[[Category:Fabrication Procedures]]

Revision as of 22:00, 18 June 2011

  • [1] Cut 1/4"x6"x12" tube for hydraulic tank
  • [2] Cut 1/4"x6"x12" end closures
  • Secure 3 bungs - 3/4" for filler/breather, 1" for return line filter, and 2" for suction strainer (extender plus bung proper)
  • Torch out 3 bung holes as in last step
  • Grind tank edges and bung edges clean wherever bead will be welded. This is a critical step that helps eliminate pinholes after welding.
  • Clean edges and bungs
  • Ream bungs as necessary for cleaning and fit
  • Lay out on welding table
  • Close off bungs with fittings to prevent spatter from destroying threads
  • Tack everything
  • Weld
  • Assemble tank
  • Test hydraulic tank with air pressure and soap solution
    • Connect air pressure hose, plug 3/4" and 1" bungs for air tightness
    • fill air into suction strainer opening - after plugging with reducers down to air barb star. Use suction strainer as one of the reducers.
  • Grind and weld any pinholes, retest, iterate if needed