5 Minute Part Replacement: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. We are aiming for a maximum.iteration of 3 five-minute deconstruction layers to extract and replace any part
OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. We are aiming for a maximum.iteration of 3 five-minute deconstruction layers to extract and replace any part
5 minute design must by definition apply to submodules:
*Mount another hydraulic motor via splined shaft coupler and chain
*Tension chain with 1 bolt, etc.

Revision as of 03:57, 22 December 2025

OSE aims for 5 minute replacement of parts as a general design strategy. This includes anything from chips to drive units in heavy machines, which is not possible anywhere in mainstream industry. We are aiming for a maximum.iteration of 3 five-minute deconstruction layers to extract and replace any part

5 minute design must by definition apply to submodules:

  • Mount another hydraulic motor via splined shaft coupler and chain
  • Tension chain with 1 bolt, etc.