==Gantt for Home Completion==
==Gantt for Home Completion==
Note finish work at final site starts as soon as first section is dropped off.
Note finish work at final site starts as soon as first section is dropped off. Assumes 1 hour travel time to site.  


[[File:cribbing.png]]
[[File:cribbing.png]]

Revision as of 16:22, 15 January 2026

Risk Mitigation - Home Builds

Best case build from Future Builders Crash Course - (very complete at end of crash course):

Best-Case Post–Crash Course House Completion (24 Crew, 2 Build Days/Week, 8 hrs/day, No Inspections)
Phase Scope Labor (hrs) Calendar Time (weeks) Notes
Disassembly, Transport, Set, Tie-Down, Leveling, Weatherproofing Repairs Final separation (if any), loading/hauling, setting in place, anchoring, leveling, resealing joints, flashing, roof/wall patching 80–120 0.2–0.3 Assumes minimal transport damage and standardized foundation/interface details
Utility Hookups / Service Gear (Simplified) Electrical service tie-in, grounding, panel hookup, minimal plumbing or off-grid connections 40–80 0.1–0.2 No permitting or inspection delays; materials pre-staged
Interior Finish Completion & Corrections Minor drywall/paint touch-ups, trim corrections, hardware tightening, surface sealing 60–120 0.2–0.3 House exits crash course at ~90–95% finish quality
Code-Related Items (Even If Not Inspected) Smoke/CO alarms, GFCI/AFCI devices, handrails/guards, egress hardware, labeling 20–40 0.05–0.1 Simple retrofits with pre-kitted components
Site Items Steps/landing, skirting, minor grading, splash control, threshold sealing 30–60 0.1–0.2 Standard site conditions; no major earthwork
Punch List & Buyer-Ready Detailing Caulking, paint touch-ups, door/window adjustments, cleaning, final detailing 20–40 0.05–0.1 One-pass punch list; limited rework
TOTAL End-of-transport to sale-ready 250–400 0.65–1.05 weeks 384 labor-hrs/week production capacity

Gantt for Home Completion

Note finish work at final site starts as soon as first section is dropped off. Assumes 1 hour travel time to site.

Cribbing.png

OSE High-Enrollment Financial Scenario (6 Months)

(source - [1])

Assumptions

  • 50 Enterprise participants @ $10k
  • Full production rate → ~1 house every 4 weeks ≈ 6 houses in 6 months
  • Net margin per house: $100k
  • Builder Crash Course: 24 participants @ $2k
  • Trial Track: 25 participants @ $6k
  • Cabin cost: $2,000 per person (50 cabins)
  • Full staffing model (education, construction, site ops, admin)
  • Infrastructure buildout: Rapid Learning Facility, Hangar, New Housing
Section Category Calculation Amount
Revenue House Builds 6 × $100,000 $600,000
Enterprise Track 50 × $10,000 $500,000
Builder Crash Course 24 × $2,000 $48,000
Trial Track 25 × $6,000 $150,000
Other / Workshops / Events Estimate $50,000
Total Revenue $1,348,000
Costs Staffing (Full Team) Ops, build, education, admin $420,000
Rapid Learning Facility Fixed $50,000
Hangar Completion Fixed $50,000
New Housing Fixed $50,000
Cabins 50 × $2,000 $100,000
Site Operations Food, utilities, waste, logistics $120,000
Curriculum & Systems Kits, documentation, program design $75,000
Tools & Equipment Fabrication, construction, maintenance $60,000
Insurance, Legal, Compliance Fixed $25,000
Marketing & Recruiting Media, campaigns, onboarding $40,000
Total Costs $940,000
Net Result Total Revenue $1,348,000
Total Costs $940,000
Net Surplus (6 months) +$408,000

OSE Low-Enrollment Financial Scenario (6 Months)

Assumptions

  • 24 Enterprise participants @ $10k
  • House production at 50% rate → ~2.5 houses in 6 months
  • Net margin per house: $100k
  • Cabin cost: $2,750 per person
  • Lean staff only (“Mode A: Bootstrap Civilization”)
  • Site Operations corrected to $32k
Section Category Calculation Amount
Revenue House Builds 2.5 × $100,000 $250,000
Enterprise Track 24 × $10,000 $240,000
Builder Crash Course 24 × $2,000 $48,000
Trial Track 12 × $6,000 $72,000
Total Revenue $610,000
Costs Staffing (Lean Core) Core leadership + minimal admin $192,500
Rapid Learning Facility Fixed $50,000
Hangar Completion Fixed $50,000
New Housing Fixed $50,000
Cabins 24 × $2,750 $66,000
Site Operations Food, utilities, waste, logistics $32,000
Curriculum & Systems Kits, documentation, program design $45,000
Total Costs $485,500
Net Result Total Revenue $610,000
Total Costs $485,500
Net Surplus (6 months) +$124,500