Induction-Grade Automation: Difference between revisions
Jump to navigation
Jump to search
(Created page with " If a system cannot automatically generate dimensional drawings, BOMs, and executable build instructions from a single source of truth, it is not induction-grade.") |
No edit summary |
||
| Line 1: | Line 1: | ||
For May 1, 2026 - we need to set up process. | |||
If a system cannot automatically generate dimensional drawings, BOMs, and executable build instructions from a single source of truth, it is not induction-grade. | If a system cannot automatically generate dimensional drawings, BOMs, and executable build instructions from a single source of truth, it is not induction-grade. | ||
Revision as of 10:41, 20 January 2026
For May 1, 2026 - we need to set up process.
If a system cannot automatically generate dimensional drawings, BOMs, and executable build instructions from a single source of truth, it is not induction-grade.