Spring Break Operations Manual: Difference between revisions
Jump to navigation
Jump to search
| Line 9: | Line 9: | ||
=Program= | =Program= | ||
*Day 1 - [[2 Hour Construction Boot Camp]]. | *Prep webinar - watch at your leisure. 1 hour describing the week. | ||
*Day 2 - [[ | *Day 1 - Welcome presentation, half hour, and half hour intros. [[2 Hour Construction Boot Camp]] + practice wall module build - total 4 hours morning. | ||
** Afternoon: 2 hour production. 2 hour AI Assisted FreeCAD design: how to design just about anything. Part Library work - process overview, sample part generation. | |||
*Day 2 - [[2 Hour House Design Boot Camp]] | |||
=Future Infrastructure Upgrades= | =Future Infrastructure Upgrades= | ||
*Production aquaponic greenhouse | *Production aquaponic greenhouse | ||
*Pervious paver driveways, with 3D printed block | *Pervious paver driveways, with 3D printed block | ||
Revision as of 16:48, 10 February 2026
About
Design of a spring break program for 24 participants. \
Staff
- Hospitality - cooking and living space, signage, waste, garden,
24 Unit Program
- Prototypes
Program
- Prep webinar - watch at your leisure. 1 hour describing the week.
- Day 1 - Welcome presentation, half hour, and half hour intros. 2 Hour Construction Boot Camp + practice wall module build - total 4 hours morning.
- Afternoon: 2 hour production. 2 hour AI Assisted FreeCAD design: how to design just about anything. Part Library work - process overview, sample part generation.
- Day 2 - 2 Hour House Design Boot Camp
Future Infrastructure Upgrades
- Production aquaponic greenhouse
- Pervious paver driveways, with 3D printed block