Spring Break Operations Manual: Difference between revisions
Jump to navigation
Jump to search
| Line 15: | Line 15: | ||
*Prep webinar - watch at your leisure. 1 hour describing the week. | *Prep webinar - watch at your leisure. 1 hour describing the week. | ||
*Day 1 - Welcome presentation, half hour, and half hour intros. [[2 Hour Construction Boot Camp]] + practice wall module build - total 4 hours morning. | *Day 1 - Welcome presentation, half hour, and half hour intros. [[2 Hour Construction Boot Camp]] + practice wall module build - total 4 hours morning. | ||
** Afternoon: 2 hour production. 2 hour AI Assisted FreeCAD design: how to design just about anything. Part Library work - process overview, sample part generation. | ** Afternoon: 2 hour production - Cabin 1. Then a 2 hour AI Assisted FreeCAD design intro: how to design just about anything. Part Library work - process overview, sample part generation. | ||
*Day 2 - [[2 Hour House Design Boot Camp]]. Building Cabin | *Day 2 - [[2 Hour House Design Boot Camp]]. Building Cabin 2. | ||
**Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing plumbing. | **Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing plumbing. | ||
| Line 26: | Line 26: | ||
*Day 5 - [[House Design Finalization session. Building Cabin 4. | *Day 5 - [[House Design Finalization session. Building Cabin 4. | ||
**Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing | **Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing heat pump module. | ||
*Day 6 - [[Village Design Boot camp and Design Session]]. Building Cabin 5. | *Day 6 - [[Village Design Boot camp and Design Session]]. Building Cabin 5. | ||
**Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing HVAC. | **Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing HVAC. | ||
*Day 7 - project day: we build a new cabin model that we designed collaboratively in the last 5 days. | *Day 7 - project day: we build a new cabin model that we designed collaboratively in the last 5 days. Depending on the number and ambition of team - we will buils something from 120 to 240 square feet in size - either 1 or 2 modules. | ||
=Future Infrastructure Upgrades= | =Future Infrastructure Upgrades= | ||
*Production aquaponic greenhouse | *Production aquaponic greenhouse | ||
*Pervious paver driveways, with 3D printed block | *Pervious paver driveways, with 3D printed block | ||
Revision as of 17:23, 10 February 2026
About
Design of a spring break program for 24 participants. \
Staff
- 4 hour staff training required beforehand for site staff.
- Admin - admissions and questions, coordination. Handles registration process and onboarding emails.
- Hospitality and Logistics - admissions admin, cooking and living space, signage, waste, garden, store runs. Prepares site for arrival.
- Co-teachers - 2 assistants required for teaching build process.
- Logistics - materials moving and handling with skid steer.
24 Unit Program
- Prototypes
Program
- Prep webinar - watch at your leisure. 1 hour describing the week.
- Day 1 - Welcome presentation, half hour, and half hour intros. 2 Hour Construction Boot Camp + practice wall module build - total 4 hours morning.
- Afternoon: 2 hour production - Cabin 1. Then a 2 hour AI Assisted FreeCAD design intro: how to design just about anything. Part Library work - process overview, sample part generation.
- Day 2 - 2 Hour House Design Boot Camp. Building Cabin 2.
- Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing plumbing.
- Day 3 - 2 Hour PV System + Roofless Roof Design Bootcamp and Design Session. Installing 100kW of PV on Hangar..
- Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing electrical.
- Day 4 - 2 Hour Heat Pump and Thermal Battery Design Boot Campand Design Session. Building Cabin 2.
- Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing power center.
- Day 5 - [[House Design Finalization session. Building Cabin 4.
- Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing heat pump module.
- Day 6 - Village Design Boot camp and Design Session. Building Cabin 5.
- Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing HVAC.
- Day 7 - project day: we build a new cabin model that we designed collaboratively in the last 5 days. Depending on the number and ambition of team - we will buils something from 120 to 240 square feet in size - either 1 or 2 modules.
Future Infrastructure Upgrades
- Production aquaponic greenhouse
- Pervious paver driveways, with 3D printed block