PV Array Design: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 4: | Line 4: | ||
*Provide panel dimensions like for example https://wiki.opensourceecology.org/wiki/File:Adani2.png - and ask AI how many can fit in the N-S direction according to the [[PV Runner Schema]]. Provide a JPG image for the AI to parse the schema. | *Provide panel dimensions like for example https://wiki.opensourceecology.org/wiki/File:Adani2.png - and ask AI how many can fit in the N-S direction according to the [[PV Runner Schema]]. Provide a JPG image for the AI to parse the schema. | ||
*For example, if 11 can fit, and string design involves 8 panels (such as 4 strings of 2 panels each), then use 8 panels per sting to simplify the wiring. | *For example, if 11 can fit, and string design involves 8 panels (such as 4 strings of 2 panels each), then use 8 panels per sting to simplify the wiring. | ||
* | *Depending on the output of [[Determining String Design for an Inverter]] - locate the inverter closest to all the strings. | ||
*Locate inverters on opposite sides of workshop (N and S) to minimize wire lengths. Operate | |||
Revision as of 00:13, 13 April 2026
- Start with Determining String Design for an Inverter
- Run panels E-W lenghtwise to minimize the runner lengths
- Use 2 runners, 2x6 treated lumber, each.
- Provide panel dimensions like for example https://wiki.opensourceecology.org/wiki/File:Adani2.png - and ask AI how many can fit in the N-S direction according to the PV Runner Schema. Provide a JPG image for the AI to parse the schema.
- For example, if 11 can fit, and string design involves 8 panels (such as 4 strings of 2 panels each), then use 8 panels per sting to simplify the wiring.
- Depending on the output of Determining String Design for an Inverter - locate the inverter closest to all the strings.
- Locate inverters on opposite sides of workshop (N and S) to minimize wire lengths. Operate