Roof Schema: Difference between revisions
Jump to navigation
Jump to search
(→Intro) |
(→Intro) |
||
| Line 1: | Line 1: | ||
=Intro= | =Intro= | ||
Start with [[Truss Schema]]. Needs to include [[PV Array Design Guide]] with runners on framing under roof, so PV and roof design must be integrated for a low cost structure. Study [[Truss Design]] for the numbers. | Start with [[Truss Schema]]. Needs to include [[PV Array Design Guide]] with runners on framing under roof, so PV and roof design must be integrated for a low cost structure. Study [[Truss Design]] for the numbers. Look into [[Hangar]] docs for [[Large Gutter Schema]] and | ||
Revision as of 20:30, 30 April 2026
Intro
Start with Truss Schema. Needs to include PV Array Design Guide with runners on framing under roof, so PV and roof design must be integrated for a low cost structure. Study Truss Design for the numbers. Look into Hangar docs for Large Gutter Schema and