OSE Shop 2011 Interface Plate: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 20: | Line 20: | ||
It may be possible to use rebar instead of tubing for the central link | It may be possible to use rebar instead of tubing for the central link | ||
=Review=6 | |||
*Instead of 6x6 tube, use 1/2" rebar ( | |||
*How about if the flats were 18" on the side - can we make the courses run such that | |||
[[Category:OSE Shop]] | [[Category:OSE Shop]] |
Revision as of 17:24, 24 July 2011
This is made of steel and has over 12 feet of welding bead required to assemble each of them
There is a variant used at the roof peak, but it uses no unique parts.
The structures require 5 peak and up to 21 pitched assemblies. (6 for expanded storage)
That means material cost of the parts fabrication:
52 2.5'x2.5' steel plates 26 6"x6"x3' steel square tubing 104 angle plates 6x6x1/8" 104 beam plates 6x6x1/8" 52 angle support plates 1.5"x6"x1/8" 52 beam support plates 4.5"x6"x1/8" 312 linear welding feet
It may also be appropriate to weld the top plates on manually to match the vagrancies of CEB spacing
It may be possible to use rebar instead of tubing for the central link
=Review=6
- Instead of 6x6 tube, use 1/2" rebar (
- How about if the flats were 18" on the side - can we make the courses run such that