Construction 2011 Fuel Budget: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "This is a record of the fuel embodied in Construction 2011. Hours of Bobcat come from hour meter *Excavation and foundations - see videos for fuel and time *4 hours - excavati...")
 
No edit summary
Line 16: Line 16:


*Haying - 3 gallons/hr x 5+3+10 hours including raking and mowing
*Haying - 3 gallons/hr x 5+3+10 hours including raking and mowing
*Oct. 17 - $64.50 for LifeTrac
*Oct. 17 - $64.50 for LifeTrac - brick pressing optimization
*Oct. 22 - Bobcat, 24 gallons diesel
*Oct. 22 - Bobcat, 24 gallons diesel - topsoil moving
*Oct. 24 - Bobcat, 15 gallons diesel
*Oct. 24 - Bobcat, 15 gallons diesel =

Revision as of 17:42, 26 October 2011

This is a record of the fuel embodied in Construction 2011.

Hours of Bobcat come from hour meter


  • Excavation and foundations - see videos for fuel and time
  • 4 hours - excavation correction with 2 people
  • Mowing and raking - 8 hours
  • Hours baling - 2 people x10 hours
  • Hours in stacking bales - 6 hours with 5 people
  • Workshop pads -
  • Hours in forms for Hablab - 24 hours x5 people
  • Hours in concrete pour for workshop - 4 hours x4 people


  • Haying - 3 gallons/hr x 5+3+10 hours including raking and mowing
  • Oct. 17 - $64.50 for LifeTrac - brick pressing optimization
  • Oct. 22 - Bobcat, 24 gallons diesel - topsoil moving
  • Oct. 24 - Bobcat, 15 gallons diesel =