Replication/PondusLLC: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with " Tom Griffing operates Pondus LLC in Dallas, Texas. After spending nearly a month in Missouri in August, Tom has continued his efforts in documentation, design enhancements and ...")
 
Line 12: Line 12:
*Video: Chopping steel
*Video: Chopping steel
::{{YoutubePopup|rqbLuiwmMt4||powercube-window}}
::{{YoutubePopup|rqbLuiwmMt4||powercube-window}}
*Power Cube Frame Complete
::[[Image:PC-Frame.png]]


*New Power Cube drawing:
*New Power Cube drawing:

Revision as of 04:21, 16 November 2011

Tom Griffing operates Pondus LLC in Dallas, Texas. After spending nearly a month in Missouri in August, Tom has continued his efforts in documentation, design enhancements and in replicating his first Power Cube. He is targeting a LifeTrac once the Power Cube is complete.

Progress to date

  • All major parts have arrived
  • Frame complete
  • Hydraulic reservoir welded and pressure tested
  • Steel cut for engine & pump mounting

Photos / videos of progress and enhacements

  • Video: Chopping steel
http://img.youtube.com/vi/rqbLuiwmMt4/default.jpg
  • Power Cube Frame Complete
PC-Frame.png
  • New Power Cube drawing:
NewPowerCubeSpec2.png
  • New Muffler Design:
BSMuffler breakout.png
  • Larger Fuel Tank:
FuelTank5.5.png