LifeTrac II Bill of Materials: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 20: Line 20:
[[Category:Bill of Materials]]
[[Category:Bill of Materials]]
[[Category:BOM]]
[[Category:BOM]]
[[Category:LifeTrac]]

Revision as of 00:21, 28 December 2011

Materials Cost of LifeTrac

TOTAL - $7693

TOTAL BOM WITH SOIL PULVERIZER AND 1 POWER CUBE - $8675

TOTAL BOM WITH SOIL PULVERIZER AND 2 POWER CUBES - $10425

See this page for the bill of materials for the CEB press.