XM: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 2: Line 2:


*If design is separated from build, cost increases - with reference to [[Open Capitalist Platform]]. How to incorporate rapid delivery into Open Capitalist Platform.
*If design is separated from build, cost increases - with reference to [[Open Capitalist Platform]]. How to incorporate rapid delivery into Open Capitalist Platform.
*Assure integration via [[Contract-First Manufacturing]]
*Assure integration via [[Contract-First Manufacturing]] (CFM)
*Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
[[Category:XM]]
[[Category:XM]]

Revision as of 02:57, 10 March 2012

Extreme Manufacturing Notes

  • If design is separated from build, cost increases - with reference to Open Capitalist Platform. How to incorporate rapid delivery into Open Capitalist Platform.
  • Assure integration via Contract-First Manufacturing (CFM)
  • Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)