XM: Difference between revisions
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
*Assure integration via [[Contract-First Manufacturing]] (CFM) | *Assure integration via [[Contract-First Manufacturing]] (CFM) | ||
*Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM) | *Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM) | ||
**TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping | |||
[[Category:XM]] | [[Category:XM]] |
Revision as of 03:00, 10 March 2012
Extreme Manufacturing Notes
- If design is separated from build, cost increases - with reference to Open Capitalist Platform. How to incorporate rapid delivery into Open Capitalist Platform.
- Assure integration via Contract-First Manufacturing (CFM)
- Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
- TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping