XM: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 6: Line 6:
*Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
*Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
**TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping
**TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping
*MMF - Minimum Marketable Feature
**
*Definition of Ready - Ex. Replication of Wikispeed Car
*Definition of Done -
**Ex: 100mpg equivalent 2 passenger pelletized biomass-fueled Wikispeed car
[[Category:XM]]
[[Category:XM]]

Revision as of 04:37, 10 March 2012

Extreme Manufacturing Notes

  • If design is separated from build, cost increases - with reference to Open Capitalist Platform. How to incorporate rapid delivery into Open Capitalist Platform.
  • Assure integration via Contract-First Manufacturing (CFM)
  • Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
    • TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping
  • MMF - Minimum Marketable Feature
  • Definition of Ready - Ex. Replication of Wikispeed Car
  • Definition of Done -
    • Ex: 100mpg equivalent 2 passenger pelletized biomass-fueled Wikispeed car