XM: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
(Redirected page to Extreme Manufacturing)
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Extreme Manufacturing Notes=
#Redirect [[Extreme Manufacturing]]
 
*If design is separated from build, cost increases - with reference to [[Open Capitalist Platform]]. How to incorporate rapid delivery into Open Capitalist Platform.
*Assure integration via [[Contract-First Manufacturing]] (CFM)
**Example of excellent interface - [little bits - http://littlebits.cc/]
*Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
**TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping
*MMF - Minimum Marketable Feature
**
*Definition of Ready - Ex. Replication of Wikispeed Car
*Definition of Done -
**Ex: 100mpg equivalent 2 passenger pelletized biomass-fueled Wikispeed car
 
==Meta==
*Process can be divided for all parts of development:
**Organizational infrastructure
**Advisory Board development
**Strategic Development
**Development of one of 50 technologies
**Factor e Farm development
***Land Stewardship
***Production
***Post-scarcity village development
**Global Collaboration Development
**Resource Development
**Recruiting
**
 
=Diagram=
 
<html><img src="https://docs.google.com/drawings/pub?id=1LfaTjD41qFkCN7j_Opl8AvMWixz38rDrw447EwDJcdw&amp;w=960&amp;h=720"></html>
 
 
[[Category:XM]]

Latest revision as of 23:03, 10 March 2012