XM Planning and Review Strategy: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
No edit summary  | 
				No edit summary  | 
				||
| Line 4: | Line 4: | ||
*Review Survey sent 30 days after Planning Survey, logged as Planning Survey  | *Review Survey sent 30 days after Planning Survey, logged as Planning Survey  | ||
*Default function of Control Panel is to visualize progress - by quantity of tasks completed in Panel  | *Default function of Control Panel is to visualize progress - by quantity of tasks completed in Panel  | ||
Tenure decisions should be made on:  | |||
*Adherence to contract terms  | |||
*Meeting Minimum Acceptable Performance standards defined in a person's contract on a monthly basis  | |||
*Long Term Intent in contract involves participation through 2013 or 2015, the slated completion or infrastructure and slated completion of the GVCS 50  | |||
Suggested review meetings should include:  | |||
*Assessment of month goals (Planning and Review spreadsheet)  | |||
*Assessment of meeting long-term goals (quarterly, discussing trajectory through 2013 or 2015)  | |||
Suggested Documentation Includes ready visibility of:  | |||
*Contract published  | |||
*Work Plan from contract published  | |||
*Monthly Planning and Review  | |||
[[Category:Flashy XM]]  | [[Category:Flashy XM]]  | ||
Latest revision as of 21:43, 5 August 2012
So far, the only planning and review strategy involves these components on Flashy XM.
- Planning Survey sent to each developer every month, logged in database in Work Log window, broken down by person
 - Review Survey sent 30 days after Planning Survey, logged as Planning Survey
 - Default function of Control Panel is to visualize progress - by quantity of tasks completed in Panel
 
Tenure decisions should be made on:
- Adherence to contract terms
 - Meeting Minimum Acceptable Performance standards defined in a person's contract on a monthly basis
 - Long Term Intent in contract involves participation through 2013 or 2015, the slated completion or infrastructure and slated completion of the GVCS 50
 
Suggested review meetings should include:
- Assessment of month goals (Planning and Review spreadsheet)
 - Assessment of meeting long-term goals (quarterly, discussing trajectory through 2013 or 2015)
 
Suggested Documentation Includes ready visibility of:
- Contract published
 - Work Plan from contract published
 - Monthly Planning and Review