Cost Structure 2012: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Our enterprise is both Cost-Driven and Value-Driven. For the entrepreneur or maker, our materials costs are typically 1/5-1/10 the cost of turnkey, industrial counterparts. This...") |
(No difference)
|
Revision as of 13:32, 4 September 2012
Our enterprise is both Cost-Driven and Value-Driven.
For the entrepreneur or maker, our materials costs are typically 1/5-1/10 the cost of turnkey, industrial counterparts. This allows for a robust, cost-driven business model. This is under the assumption of access to low-cost fabrication machinery and knowhow - to allow for effective production. These low cost tools of production are part of the GVCS.