Income and Expense Reporting: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
See [[Delay Times in Online Financial Reporting]]
See [[Delay Times in Online Financial Reporting]]


Line 4: Line 6:
*Income shall be updated on an ongoing basis upon money entering any account with up to a 24 hour delay for updates during working days
*Income shall be updated on an ongoing basis upon money entering any account with up to a 24 hour delay for updates during working days
*Reporting shall be posted on the front page of the wiki - linked to [[OSE_Financial_Transparency_2012]]
*Reporting shall be posted on the front page of the wiki - linked to [[OSE_Financial_Transparency_2012]]
*Each item shall be categorized by Grant or Source and by area (agriculture, construction, machine dev, overhead, etc)
**Use columns for those labels so that whole list is organized automatically by Sort Sheet in Google Doc, see [https://docs.google.com/spreadsheet/ccc?key=0Aj7WbjRT9mlmdGRQU3lCZXpLRG11ZDJ1VmQwUGhqNGc#gid=1 example]

Revision as of 14:00, 29 September 2012


See Delay Times in Online Financial Reporting

  • Expenses shall be updated on an ongoing basis with up to a 24 hour delay for updates during working days
  • Income shall be updated on an ongoing basis upon money entering any account with up to a 24 hour delay for updates during working days
  • Reporting shall be posted on the front page of the wiki - linked to OSE_Financial_Transparency_2012
  • Each item shall be categorized by Grant or Source and by area (agriculture, construction, machine dev, overhead, etc)
    • Use columns for those labels so that whole list is organized automatically by Sort Sheet in Google Doc, see example