Chuck Log: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
(→Log) |
||
Line 3: | Line 3: | ||
= Log = | = Log = | ||
== 18-Nov-2012 thru 24-Nov-2012 == | |||
* sync grbl to [https://github.com/grbl/grbl/commit/5dd6d90122dce991a99eab5aa3a5c991dd5c938a upstream]..success. | |||
* replaced mechanical microswitches on X1-X2 axis with opto sensors..success | |||
== 11-Nov-2012 thru 17-Nov-2012 == | == 11-Nov-2012 thru 17-Nov-2012 == | ||
* start log. | * start log. |
Revision as of 03:52, 19 November 2012
Intro
A chronological log for Chuck Harrison, occasional off-site collaborator.
Log
18-Nov-2012 thru 24-Nov-2012
- sync grbl to upstream..success.
- replaced mechanical microswitches on X1-X2 axis with opto sensors..success
11-Nov-2012 thru 17-Nov-2012
- start log.
- ship Millermatic 200 welder (Seattle craigslist) by LTL truck to FEF. 400 lbs for $500; was that reasonable?
- steppernug (open source stepper driver) schematic review with Darren
- received photointerrupters for torch table testing
- looking into "does not quite reach position" bug in my grbl branch
Ancient history
First contact with OSE Sept 2011 briefly on site. I was in the area visiting relatives David Ihnen and Margaret Havens.