Chuck Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 5: Line 5:
== 18-Nov-2012 thru 24-Nov-2012 ==
== 18-Nov-2012 thru 24-Nov-2012 ==
* sync grbl to [https://github.com/grbl/grbl/commit/5dd6d90122dce991a99eab5aa3a5c991dd5c938a upstream]..success.
* sync grbl to [https://github.com/grbl/grbl/commit/5dd6d90122dce991a99eab5aa3a5c991dd5c938a upstream]..success.
* replaced mechanical microswitches on X1-X2 axis with photointerrupters..success
* replaced mechanical microswitches on X1-X2 axis with photointerrupters..success. [[Stepper_Testing#opto|Testing]]


== 11-Nov-2012 thru 17-Nov-2012 ==
== 11-Nov-2012 thru 17-Nov-2012 ==

Revision as of 05:54, 19 November 2012

Intro

A chronological log for Chuck Harrison, occasional off-site collaborator.

Log

18-Nov-2012 thru 24-Nov-2012

  • sync grbl to upstream..success.
  • replaced mechanical microswitches on X1-X2 axis with photointerrupters..success. Testing

11-Nov-2012 thru 17-Nov-2012

  • start log.
  • ship Millermatic 200 welder (Seattle craigslist) by LTL truck to FEF. 400 lbs for $500; was that reasonable?
  • steppernug (open source stepper driver) schematic review with Darren
  • received photointerrupters for torch table testing
  • looking into "does not quite reach position" bug in my grbl branch

Ancient history

First contact with OSE Sept 2011 briefly on site. I was in the area visiting relatives David Ihnen and Margaret Havens.