Development Infrastructure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
{{under construction}}
{{Tech Development}}


=Notes on Wiki Infrastructure for Open Engineering=
=Organization=


Marcin's comments:
Workshop needs a lot of organization. 100 hours should get it to a much more workable state.


*We need: a Platform for Open Engineering
=Maintenance=
*Marcin's personal attempt: openfarmtech.org - under Development Template.
**However, this has a particular spec for its open engineering - it is open engineering + OSE Specifications (see Main Page)
*Once a better infrastructure for projects exists at Appropedia, then we could consider using it for some technical developments.
*Summary: unless someone can show me a better development platform, the Development Template is good enough for now. It embodies OSE Spec.


'''Critical additional comment''':
A lot of tools need maintaining.
*OSE adds value in that (1) attempts open engineering, (2) does so according to a very unique goal - replicable villages with particular attributes as described on the Main Page
*It is the addition of value according to a unique goal that adds value to the open engineering itself. It is what drives the specifications for open engineering.
*I don't think one would come up with an option for creating OSE's replicable village if one just took a number of technologies and put them together. The OSE Specification (look on Main Page) is a glue for the type of engineering that goes on. Without that glue, you'd never arrive at the type of engineering proposed.


Comments?
Second mill needs to be fixed.
----
 
Lathe needs to get operational.
 
Surface grinder needs to get dressed.
 
First mill needs to be lubricated. 3/4" dia collet mounting problem needs to be fixed.
 
Bandsaw needs cutting fluid refill.
 
Problematic welders need troubleshooting and repair.
 
=Inventory=
 
Standard stock of fasteners needs to be ordered and organized.
 
Stock of hydraulic hoses and fittings needs ordering and organizing.
 
Stock of electronic components needs ordering and organizing.

Revision as of 21:25, 22 December 2012

Tech Development

Organization

Workshop needs a lot of organization. 100 hours should get it to a much more workable state.

Maintenance

A lot of tools need maintaining.

Second mill needs to be fixed.

Lathe needs to get operational.

Surface grinder needs to get dressed.

First mill needs to be lubricated. 3/4" dia collet mounting problem needs to be fixed.

Bandsaw needs cutting fluid refill.

Problematic welders need troubleshooting and repair.

Inventory

Standard stock of fasteners needs to be ordered and organized.

Stock of hydraulic hoses and fittings needs ordering and organizing.

Stock of electronic components needs ordering and organizing.