Operations 2013 Brief: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
==Built Environment== | ==Built Environment== | ||
We currently have a 4000 sf workshop and a 3000 sf living unit for 10 people, plus 2 natural buildings with stove. | |||
==Utilities== | ==Utilities== | ||
==Agriculture== | ==Agriculture== | ||
==Roads and Watershed== | |||
=Infrastructure Needs= | =Infrastructure Needs= | ||
Line 9: | Line 13: | ||
==Site Cleanup== | ==Site Cleanup== | ||
==Staff Housing Plans== | ==Staff Housing Plans== | ||
== | ==Utility Improvements== | ||
===Grid=== | ===Grid=== | ||
===Biogas=== | ===Biogas=== | ||
==Workshop== | ==Improvements to Existing Structures== | ||
===Workshop=== | |||
===Living Units=== | |||
===Natural Buildings=== | |||
==Waterworks== | ==Waterworks== | ||
==Erosion Stabilization== | ==Erosion Stabilization== |
Revision as of 20:58, 11 February 2013
Infrastructure
Built Environment
We currently have a 4000 sf workshop and a 3000 sf living unit for 10 people, plus 2 natural buildings with stove.