FeF Prototyping Schedule 2013: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 9: Line 9:
*Jun 7-8 - Ironworker redesign for fabrication
*Jun 7-8 - Ironworker redesign for fabrication
*Jun 14-15 - Open Source Laser Cutter
*Jun 14-15 - Open Source Laser Cutter
*Jun 21-22 - Open Source MIG Welder power supply, OS wire feed, OS Gas feed, to standard gun.
With CNC Torch Table, Ironworker, and Welder power supply, we can fabricate rapidly.

Revision as of 02:18, 22 February 2013

  • Product Lead, Documenter, Ops Manager, recruited by April 1
  • Apr 19-20 - CNC Torch table
  • (April 6-28 - OSHW Hackberry Jam)
  • (May 2-4 - Seoul Digital Forum)
  • May 10-11 - Bulldozer + geardown + blade + weights modules
  • May 17-18 - CNC Circuit Mill + 3D Printer
  • May 24-25 - Large Power Cube module - 150 hp
  • May 31-1 - OS Car
  • Jun 7-8 - Ironworker redesign for fabrication
  • Jun 14-15 - Open Source Laser Cutter
  • Jun 21-22 - Open Source MIG Welder power supply, OS wire feed, OS Gas feed, to standard gun.

With CNC Torch Table, Ironworker, and Welder power supply, we can fabricate rapidly.