Wiring Calculations: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "An off-grid microindustrial facility requires 200kW of electric power to power a wide range of industrial processes. This could be achieved at 500V and 400A, which can be hand...")
(No difference)

Revision as of 19:23, 10 April 2013

An off-grid microindustrial facility requires 200kW of electric power to power a wide range of industrial processes. This could be achieved at 500V and 400A, which can be handled by 0/4 wire (400A free air ampacity).