An microindustrial facility requires 200kW of electric power to power a wide range of industrial processes. This could be achieved at 500V and 400A, which can be handled by 0/4 wire (400A free air ampacity). This applies to grid and off-grid power, where in the off-grid power case, a 200kW [[Electric Motor/Generator]] can provide the necessary power. |
Revision as of 19:24, 10 April 2013
Towards Open Source Microindustry
An microindustrial facility requires 200kW of electric power to power a wide range of industrial processes. This could be achieved at 500V and 400A, which can be handled by 0/4 wire (400A free air ampacity). This applies to grid and off-grid power, where in the off-grid power case, a 200kW Electric Motor/Generator can provide the necessary power.