Grading plan: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Objective: To create a grading plan in order to reduce the flooding of the walkways around Factor e Farm when it rains.") |
No edit summary |
||
Line 1: | Line 1: | ||
Objective: To create a grading plan in order to reduce the flooding of the walkways around Factor e Farm when it rains. | Objective: To create a grading plan in order to reduce the flooding of the walkways around Factor e Farm when it rains. | ||
Here is a view of the main walkway around Factor e Farm after a heavy rain: | |||
[[File:Grading1.JPG]] | |||
[[File:Grading2.JPG]] | |||
[[File:Grading3.JPG]] |