June 22, 2013 Sprint Introduction: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
Welcome to our June 22 Design Sprint. Today is the last sprint prior to our 10 day Build Sprint. However, we do intend to run a Design Sprint next week while we do a Build Sprint at Factor e Farm. This depends on us recruiting a collaborator who can manage contributions at the same time that we run physical buildout at Factor e Farm. This is our general pathway moving forward as we scale our global collaboration. | Welcome to our June 22 Design Sprint. Today is the last sprint prior to our 10 day Build Sprint. However, we do intend to run a Design Sprint next week while we do a Build Sprint at Factor e Farm. This depends on us recruiting a collaborator who can manage contributions at the same time that we run physical buildout at Factor e Farm. This is our general pathway moving forward as we scale our global collaboration. | ||
We have 8 tons of metal coming in next week, and the hydraulics are here. We have at least 6 Power Cubes to work with. |
Revision as of 14:14, 22 June 2013
Welcome to our June 22 Design Sprint. Today is the last sprint prior to our 10 day Build Sprint. However, we do intend to run a Design Sprint next week while we do a Build Sprint at Factor e Farm. This depends on us recruiting a collaborator who can manage contributions at the same time that we run physical buildout at Factor e Farm. This is our general pathway moving forward as we scale our global collaboration.
We have 8 tons of metal coming in next week, and the hydraulics are here. We have at least 6 Power Cubes to work with.